Breaking News, World News and Taiwan News.

TRA catenary severed, delaying over 10,000 passengers

TAIPEI, Taiwan -- A catenary wire on the Taiwan Railways Administration (TRA) east to west main line was reported severed yesterday, causing a mass delay to over 10,000 passengers who complained angrily to the TRA.

According to the TRA, a local train, number 1223, from Keelung to Miaoli reported a severed wire while passing through Songshan-Taipei east line at 4:20 p.m. in the afternoon. The incident caused the southbound eastern mainline to halt, with the western mainline forced to operate as a two-way line for the sake of operations.

The 400 passengers of the 1223 had reportedly been transported back to Taipei Main Station by 5:10 p.m. Though the train itself reported no malfunctions, it was towed back to the Songshan station for safety purposes.

Following the incident, the Taipei Main Station observed an instant mass increase in passenger crowds waiting for their trains. Reportedly, the majority of the passengers became very upset after waiting for a long period of time.

Until 6:45 p.m. yesterday, preliminary estimates revealed at least 10, 000 passengers were affected, with average delays between 30 to 40 minutes. As the accident was reported during rush hour, the number of affected passengers was greater than normal.

At least 35 trains were delayed with the some trains delayed up to 100 minutes. Reportedly, the TRA has stated that any passengers whose train was delayed for over 45 minutes will be entitled to a full refund.

TRA mobilized the entirety of its power engineering staff in Taipei to repair the damage, with the repairs reportedly completed at 8:53 p.m., and two-way traffic restored to the TRA at 8:57 p.m.

The TRA publically apologized for the inconvenience, and stated that they will conduct further investigations to the cause of the severed wire. The TRA has also promised that proper refunds will be made.

July 29, 2014    boogurtwang@
For those not familiar with the term "caternary," it simply means loosely hanging or slack, as in not tightly hung.
So, what we have here is a loosely hanging wire that was hit by something and cut. This caused a power outage; as it appears this loosely hanging wire was of importance to the functioning of the railway.

Otherwise stated as - "SLOPPY WORK CAUSES RAILWAY SHUT-DOWN"
September 21, 2014    chang.weif.22093@
Boogurt,

Catenary is a technical railway term for electrical contact wire, which normally are strung at high tension. As most of Taiwan's railway network is electrified, this means that upon breakage, the train lost power (thus needing to be towed back).

Otherwise stated as - "CHECK YOUR FACTS BEFORE YOU POST"
Write a Comment
CAPTCHA Code Image
Type in image code
Change the code
 Receive China Post promos
 Respond to this email
 Rain forecast from Wed., tropical depression nears 
Passengers crowd at platform 2 of Songshan Train Station after platform 1 was shut down due to a railway line incident. A severed line caused over 10,000 passengers to be affected by a mass delay. (CNA)

Enlarge Photo
Subscribe  |   Advertise  |   RSS Feed  |   About Us  |   Career  |   Contact Us
Sitemap  |   Top Stories  |   Taiwan  |   China  |   Business  |   Asia  |   World  |   Sports  |   Life  |   Arts & Leisure  |   Health  |   Editorial  |   Commentary
Travel  |   Movies  |   TV Listings  |   Classifieds  |   Bookstore  |   Getting Around  |   Weather  |   Guide Post  |   Student Post  |   English Courses  |   Terms of Use  |   Sitemap
  chinapost search